Kennesaw State University
Universities
Resolving…
HVAC Disruption at 440 English Building on 8/17
MonitoringNew Information: -Parts needed for the repair are currently en route. In the meantime, the HVAC unit is operating as effectively as possible, given the temporary limitations. -At this time, the building is maintaining normal temperatures between 70°F-74°F throughout. -A contingency plan is in place to maintain stable building conditions until full repairs can be completed. -The building is bein...
Location:
United States (US)
Started:
2026-08-17 14:05 UTC
(Aug 17, 2026)
Updated:
2026-08-25 20:11 UTC
(22d ago)
Resolved:
N/A
2026-08-20 19:48 UTC
(27d ago)
:
Plant Operations is continuing to monitor temperatures. Further repairs are underway.
2026-08-18 19:25 UTC
(29d ago)
:
The building is still currently maintaining temperatures between 72°F and 74°F throughout.
2026-08-18 15:34 UTC
(29d ago)
:
New Information: -One of our designated HVAC contractors was onsite yesterday evening to assess why the building was not cooling properly after the cooling tower foaming issue was resolved. Their technician identified a failed chiller bearing module controller. -The estimated lead time for the replacement controller is approximately 2-4 days. -Until the controller is replaced, the chiller can o...
Related Technologies
UC Santa Barbara ITS
Universities
|
Active incidents
UBC IT
Universities
|
Active incidents
Dartmouth College
Universities
|
Active incidents
Stony Brook University
Universities
Athabasca University
Universities
UC San Diego ITS
Universities
|
Active incidents
Brown University
Universities
|
Active incidents
British Columbia Institute of Technology
Universities
University of Derby
Universities
Northeastern University IT
Universities
|
Active incidents